The Trilogy Residential project will consist of a multi-building multifamily residential development from Garden Communities. Located in Irvine's Irvine Business Complex, the development will consist of 876 residential units.
By: Chad Kim
The Trilogy Residential project will consist of a multi-building multifamily residential development from Garden Communities. Located in Irvine's Irvine Business Complex, the development will consist of 876 residential units.
Comments
By: Chad Kim
University of California, Irvine (UC Irvine) has released their initial study environmental report regarding their proposed project to construct a new student housing midrise structure.
By: Chad Kim
The Alton apartment is a 344 apartment unit project located in Irvine's Irvine Business Complex at the intersection of Alton and Millikan. By: Chad Kim
According to Urbanize LA, the upcoming Broadcom headquarters will consist of a 1.1 million sq ft office campus.
By: Chad Kim
LAOCDB reported about the Irvine Spectrum Marriott back in July 2015 when it was first proposed at the site of a former surface parking lot. Photo from June 25, 2016 show construction has progressed with the installation of a construction crane. Additionally, the core of the structure is rising.
By: Chad Kim
400 Spectrum Center is a 20 story office tower in the City of Irvine near the Irvine Spectrum mall. LAOCDB reported back in Dec 28, 2015, 400 Spectrum Center project was under site prep. Fast forward to June 2016 and the tower is topped off.
Image Credit: Hunter Kerhart
By: Chad Kim The Irvine Spectrum area in the City of Irvine has been seeing an increase in high-rise development. Here is a recap of the high rise developments in the Irvine Spectrum area:
By: Chad Kim
A Homewood Suites Extended Stay Hotel is under construction in the City of Irvine's Irvine Business Complex (IBC) at 17370 Red Hill Avenue at the intersection of Red Hill Avenue and Reynolds Avenue. Source
By: Chad Kim From a previous post: "An Irvine Planning Commission report (05/07/2015) sheds light on the proposed project named Irvine Gateway located at 17150 Von Karman Avenue. The developer, FF Realty II, LLC., is aiming to build a total of 434 residential units (out of the total, 44 rental units are affordable units) on a 8.51 acre site (~51 DU/Acre). The project is aiming to get a density bonus of 87 residential units and accordingly, there are 347 base residential units. The total of these two adds up to the overall total residential units proposed in the project. While the north side of the project site is proposed to have a 5 story apartment (363 rental units; may have the future option of turning into for sale condo units), the south side is proposed to have for sale attached three story townhomes (71 units). The apartment building configuration is a wrap-around and the parking garage will have six levels."
By: Chad Kim
According to a City of Irvine document, 400 Spectrum Center tower will become the twin to the existing 200 Spectrum Center tower. The upcoming second tower is also from the Irvine Company and will stand at 20 stories tall.
By: Chad Kim
The last picture update was back in 10/07/2015. Since then, a second crane has been installed. Click here for the 9/25/2015 picture update. According to the Togawa Smith Martin architect's website, this project is a mixed use development that will have a total of 457 rental units. From the rendering, it appears the buildings range from having 6 to 7 floors.
By: Chad Kim
The previous update regarding this project was back in 10/11/2015. Here is an excerpt from the previous report: "According to the City of Irvine's Request For Planning Commission Action report from April 17, 2014, The Element is a mixed use project located in the City of Irvine's IBC district. The Element is a phased project consisting of three phases where the total units will be 1,600 residential units. The breakdown of each phase pertains to Phase 1 having 700 residential units and the project site is 10 acres. Amenities would include a public park and other amenities for the future residents. Phase 2 would have 307 residential units and amenities for future residents. Phase 3, the last phase, would have 593 residential units and is where the mixed use component will be located with as the report states, "...primary- and accessory/resident-serving commercial areas". Amenities at the 3rd phase includes a public plaza and other amenities for future residents."...
By: Chad Kim
2801 Kelvin Avenue Project, from United Dominion Realty (UDR), is continuing to move forward in its construction progress. This project consists of 381 dwelling units (DU). By: Chad Kim
It has been a couple months since the last picture update. For those not familiar with this project check out the prior post at the following link: http://www.laocdb.com/oc-development-news/360-fusion-apartment-homes-project-in-irvines-ibc |
Advertisement:Category by City:
All
Archives
January 2017
|