A Homewood Suites Extended Stay Hotel is under construction in the City of Irvine's Irvine Business Complex (IBC) at 17370 Red Hill Avenue at the intersection of Red Hill Avenue and Reynolds Avenue.
By: Chad Kim
A Homewood Suites Extended Stay Hotel is under construction in the City of Irvine's Irvine Business Complex (IBC) at 17370 Red Hill Avenue at the intersection of Red Hill Avenue and Reynolds Avenue.
Comments
By: Chad Kim
A prior segment was written on the upcoming Uptown Newport Village project located in Newport Beach at Jamboree Road and Fairchild Road. See below for picture and video updates. Source
By: Chad Kim From a previous post: "An Irvine Planning Commission report (05/07/2015) sheds light on the proposed project named Irvine Gateway located at 17150 Von Karman Avenue. The developer, FF Realty II, LLC., is aiming to build a total of 434 residential units (out of the total, 44 rental units are affordable units) on a 8.51 acre site (~51 DU/Acre). The project is aiming to get a density bonus of 87 residential units and accordingly, there are 347 base residential units. The total of these two adds up to the overall total residential units proposed in the project. While the north side of the project site is proposed to have a 5 story apartment (363 rental units; may have the future option of turning into for sale condo units), the south side is proposed to have for sale attached three story townhomes (71 units). The apartment building configuration is a wrap-around and the parking garage will have six levels."
By: Chad Kim
According to a City of Irvine document, 400 Spectrum Center tower will become the twin to the existing 200 Spectrum Center tower. The upcoming second tower is also from the Irvine Company and will stand at 20 stories tall.
By: Chad Kim
Check out the previous update here: http://www.laocdb.com/oc-development-news/picture-update-of-200-spectrum-center-tower-in-irvine
According to the Irvine Company's 200 Spectrum Center website, the tower is 21 stories and is 323 ft. tall. As previously mentioned in an earlier update, the 200 Spectrum Center tower is the tallest building in Orange County. The tower is located next to the Irvine Spectrum Center, a regional mall.
By: Chad Kim
From a previous report: According to the City of Santa Ana, the project located at 1901 East First Street consists of 256 apartment units. The total size of the project site is 5.1 acres and will have three 5 story buildings which total to 242 apartment units, and will also include 14 town-home units (each are 3 stories tall). The 5 story buildings will be located at the central and west side. The project site already has an existing parking structure that has 4 levels and contains a total of 660 parking spaces. The town-home units will be located east and south of the parking structure. The City's description also states that the units will be built to condominium standards which would allow the developer to sell individual units in the future. Nineteen01 is now leasing and more information can be found at their website: http://www.nineteen01.com/
By: Chad Kim
According to a City of Irvine document, the Hyatt House Hotel project is located near the intersection of Main Street and Von Karman in the City of Irvine. The project consists of a five story building with a total of 149 hotel rooms.
By: Chad Kim
The last picture update was back in 10/07/2015. Since then, a second crane has been installed. Click here for the 9/25/2015 picture update. According to the Togawa Smith Martin architect's website, this project is a mixed use development that will have a total of 457 rental units. From the rendering, it appears the buildings range from having 6 to 7 floors.
By: Chad Kim
The previous update regarding this project was back in 10/11/2015. Here is an excerpt from the previous report: "According to the City of Irvine's Request For Planning Commission Action report from April 17, 2014, The Element is a mixed use project located in the City of Irvine's IBC district. The Element is a phased project consisting of three phases where the total units will be 1,600 residential units. The breakdown of each phase pertains to Phase 1 having 700 residential units and the project site is 10 acres. Amenities would include a public park and other amenities for the future residents. Phase 2 would have 307 residential units and amenities for future residents. Phase 3, the last phase, would have 593 residential units and is where the mixed use component will be located with as the report states, "...primary- and accessory/resident-serving commercial areas". Amenities at the 3rd phase includes a public plaza and other amenities for future residents."...
By: Chad Kim
The Brookhurst Triangle is a mixed-used project that is located within the City of Garden Grove and is located north of the former Garden Grove Galleria project. According to the OC Register (website), in early March 2014, the Garden Grove planning commission approved a revised Brookhurst Triangle which is downsized compared to the former proposal. Prior, the Union Pacific Builders proposed two skyscrapers, homes, and retail. However, this did not materialize and the Union Pacific Builders dropped out (source).
By: Chad Kim
The Domain is a low-rise project located near the heart of Downtown Anaheim and the popular Anaheim Packing District. Developed by Brookfield Residential, the residential units consists of townhomes and flats that are for sale.
By: Chad Kim
2801 Kelvin Avenue Project, from United Dominion Realty (UDR), is continuing to move forward in its construction progress. This project consists of 381 dwelling units (DU). By: Chad Kim
It has been a couple months since the last picture update. For those not familiar with this project check out the prior post at the following link: http://www.laocdb.com/oc-development-news/360-fusion-apartment-homes-project-in-irvines-ibc 'The Edge' Mixed Use Development proposed in Fullerton (Up to 1,142 residential units proposed)12/19/2015 By: Chad Kim
Update: It was brought to my attention from a reader, who provided an Orange County Business Journal article, that City Ventures has sold the project site to Western Realco. The new developer's are aiming to construct a business complex consisting of office and industrial buildings (Source). ---- The Edge, formerly known as 'The North Fullerton Mixed-Use Village Specific Plan', is a proposed mixed use development in the City of Fullerton where there may be up to 1,142 residential units.
By: Chad Kim
Platinum Vista is located in the City of Anaheim's (City) Platinum Triangle district. According to the City's Development Status report, Platinum Vista is under construction with 386 dwelling units (DU). The developer of the project is Wolff Company. |
Advertisement:Category by City:
All
Archives
January 2017
|