The Domain is a low-rise project located near the heart of Downtown Anaheim and the popular Anaheim Packing District. Developed by Brookfield Residential, the residential units consists of townhomes and flats that are for sale.
By: Chad Kim
The Domain is a low-rise project located near the heart of Downtown Anaheim and the popular Anaheim Packing District. Developed by Brookfield Residential, the residential units consists of townhomes and flats that are for sale.
Comments
By: Chad Kim
2801 Kelvin Avenue Project, from United Dominion Realty (UDR), is continuing to move forward in its construction progress. This project consists of 381 dwelling units (DU). By: Chad Kim
It has been a couple months since the last picture update. For those not familiar with this project check out the prior post at the following link: http://www.laocdb.com/oc-development-news/360-fusion-apartment-homes-project-in-irvines-ibc 'The Edge' Mixed Use Development proposed in Fullerton (Up to 1,142 residential units proposed)12/19/2015 By: Chad Kim
Update: It was brought to my attention from a reader, who provided an Orange County Business Journal article, that City Ventures has sold the project site to Western Realco. The new developer's are aiming to construct a business complex consisting of office and industrial buildings (Source). ---- The Edge, formerly known as 'The North Fullerton Mixed-Use Village Specific Plan', is a proposed mixed use development in the City of Fullerton where there may be up to 1,142 residential units.
By: Chad Kim
Platinum Vista is located in the City of Anaheim's (City) Platinum Triangle district. According to the City's Development Status report, Platinum Vista is under construction with 386 dwelling units (DU). The developer of the project is Wolff Company.
By: Chad Kim
Rancho La Habra is a proposed development in the City of La Habra, of which if approved, will replace the existing Westridge Golf Club. By: Chad Kim
Vivere Apartments Phase II is located in the Platinum Triangle district in the City of Anaheim. By: Chad Kim
The last visit was back in August 2, 2015. This most recent visit shows the project is continuing its vertical growth. By: Chad Kim
Red Oak Fullerton is the name of a proposed mixed use development near Downtown Fullerton.
By: Chad Kim
According to the City of Santa Ana's website, The 301 Development at City Place is located within City Place on Jeanette Lane and is a 2 acre site. The project consists of a 182 unit residential apartment building. Two bottom levels will consist of parking and the remainder four levels pertains to the residential component. The project is now under construction as indicated by the pictures below: (Pictures taken: 12/07/2015) By: Chad Kim For those not familiar with the Huntington Beach Lofts located in Huntington Beach near the Goldenwest College and Goldenwest Transportation Center, check prior post: http://www.laocdb.com/oc-development-news/huntington-beach-huntington-beach-lofts-avalonbay-communities-inc Pictures taken: 11/20/2015 Dense Development News Update in (One Broadway Plaza) Santa Ana, Anaheim, Orange, and Laguna Niguel11/19/2015 By: Chad Kim Since the last update, there has been several new development updates in the cities of Santa Ana, Orange, Anaheim, and Laguna Niguel. Further updates for each individual project forthcoming. One Broadway Plaza: Foundation only permit issued on 09/08/2015: From the City of Santa Ana's Planning webpage's "Search Plan Check Status", details about One Broadway Plaza (1001 N Broadway) can be found. The developer applied for a foundation only permit back in 05/05/2015. Further detail shows the permit was issued back in 09/08/2015. Under the "Building Permit History" tab under Permit # 10184972 and in the "Description of Work" states: "CODE UPDATE REVIEW FOR 2013 CBC-FOUNDATION ONLY for 37-story office tower. Scope of the work is limited to: installing the APG (Auger Pressure Grouted) piles and mat/pile cap only. NOTE: Basement wall is not covered under this building permit." More details to come. Rendering of One Broadway Plaza: Source: http://www.voitco.com/40th-anniversary/_images/_2000s/2006-2.png Development Activity at Eleven 10 West (260 residential units) in City of Orange (Click for prior post: http://www.laocdb.com/oc-development-news/orange-planned-eleven-10-west) Rendering (Source): Update: Picture taken: 12/07/2015 There was previously a small one story building with a parking lot which has now been demolished. Fencing is now placed. Source: Google Maps The above satellite map shows an older picture of the area. The red circle indicates where the small building used to be. Anaheim Platinum Triangle Project "The George" Broke Ground: According to the Development Status document from the City of Anaheim, this particular project is allowed up to 341 residential units. Orange County Dense Developments passed by the site recently and saw activity. Additionally, the project's website is live: http://www.livethegeorge.com/ . Pictures to come soon. From Project's website: Laguna Niguel: Picerne and Gateway Village Mixed Use are under construction: According to the City of Laguna Niguel's Major Development Activity Gateway Area project updates, the Picerne and Gateway Village Mixed Use projects are now under construction. From the document describes: Picerne entails 425 apartment units where as the Gateway Village Mixed Use entails 351 apartment units with total of 5,900 sq. ft. of retail space. Forbes Rd. Apartment (Blackwood) project was approved by the Planning Commission in October 2015. This project entails 300 apartment units with 10 commercial flex-space units. Rendering of Picerne: Pictures forthcoming. By: Chad Kim The Vireo at Park Place project is located in Irvine's Irvine Business Complex (IBC) at the Park Place mixed-use campus. The developer is Sares-Regis Group and according to their webpage regarding the project, the residential development will entail 520 rental units. Rendering: Source: http://www.sares-regis.com/Experience-Data/Vireo-at-Park-Place Site Plan (Link): http://www.sares-regis.com/files/experience/document/14_015_VIERO__OVERALL_Site_PlanSmall.pdf Pictures taken: 09/26/2015 Map of Project Site: Source: Google Maps
By: Chad Kim According to the City of Irvine's Request For Planning Commission Action report from April 17, 2014, The Element is a mixed use project located in the City of Irvine's IBC district. The Element is a phased project consisting of three phases where the total units will be 1,600 residential units. The breakdown of each phase pertains to Phase 1 having 700 residential units and the project site is 10 acres. Amenities would include a public park and other amenities for the future residents. Phase 2 would have 307 residential units and amenities for future residents. Phase 3, the last phase, would have 593 residential units and is where the mixed use component will be located with as the report states, "...primary- and accessory/resident-serving commercial areas". Amenities at the 3rd phase includes a public plaza and other amenities for future residents. The primary retail and restaurant total sq ft is between 8,500 to 17,000 sq ft. and the accessory retail and restaurants is between 8,000 and 22,000 sq ft. According to a previous OC Register article, the height of the buildings will range from 56 to 67 ft tall. The City report states at total build out there will be a total of 6 buildings. There will be a total of 3,565 parking spaces provided in this project. Phase 1 will have a total of 70 affordable units and the three phases in total will have 159 affordable units. According to the OC Register, the developer, Garden Communities, also has another project within Irvine known as Metropolis. LAOCDB previously documented the project is under construction where its construction crane can be seen from a distance on southbound Jamboree near The District in Tustin. Renderings: Site Plan: Project Site Map:
|
Advertisement:Category by City:
All
Archives
January 2017
|